Morayfield Health Hub:

  • $19m Design & Construct
  • Demolition & Refurbishment of an old Bunnings warehouse into a medical super clinic
  • New suspended concrete level 1 throughout (6000m2), level 2 floor for 2000m2
  • Roof replacement and new structural steel, New FC and alucobond cladding to façade
  • Full services installation to suit, currently in construction

Morayfield Family Doctors Fitout:

  • $5.4m
  • Full design and construction for fit-out of a 90 GP super clinic, ground floor, Morayfield Health Hub.