Morayfield Health Hub:
- $19m Design & Construct
- Demolition & Refurbishment of an old Bunnings warehouse into a medical super clinic
- New suspended concrete level 1 throughout (6000m2), level 2 floor for 2000m2
- Roof replacement and new structural steel, New FC and alucobond cladding to façade
- Full services installation to suit, currently in construction
Morayfield Family Doctors Fitout:
- $5.4m
- Full design and construction for fit-out of a 90 GP super clinic, ground floor, Morayfield Health Hub.